Our Projects
Engineering Consultancy Services
Year | Project Name | Client | Activities | Contract Period |
---|---|---|---|---|
2023 | Slope stabilization works (Design & Construction) at Bujagali Energy Limited | BUJAGALI ENERGY LIMITED BEL | Surveying, mapping, design and construction works for slope stabilization works at Bujagali | October 2022 to February 2023 |
2022 | Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | National Contracting Co. Ltd | Construction of Access Road for swampy areas and including mobilization and demobilization, supervision, manpower & operation cost | 17th February 2022 to |
2022 | Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | National Contracting Co. Ltd | Platform arrangement with murram dumping & compaction in swampy locations 10/3, 10/4 & 12D | 22nd February 2022 |
2022 | Sub Contractor: Engineering, design, construction and installation of 132 KV Mutundwe Entebbe Transmission Line | National Contracting Co. Ltd | Construction of Pad and Chimney foundations 10/2, 11/1, 12A and 12B | |
2022 | Construction of fifteen hydrological field stations in Uganda and one in DRC | Nile Basin Initiative | Surveying, procurement, construction and remediation works. |
Geotechnical Investigations & Materials Testing
Year | Project Name | Client | Activities | Contract Period |
---|---|---|---|---|
2023 | CPTu testing and soils testing at right embankment Isimba dam | China Water and Electric Corporation | CPT testing, drilling and core sampling, piezometer installations, soils testing and reporting | May 2023 |
2023 | Independent laboratories testing Total Energies | Total E & P Uganda | Sampling and testing of samples from borrow pit areas and reporting | January 2023 |
2022 | GeotechnicalInvestigationsfor 132/33 kV OHTL Gulu Agago Transmission Line | KEC International | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | Jan2022 - Dec 2022 |
2022 | Geotechnical Investigations for AyillaandAcwaIrrigation Schemes | WAPCOS(U)Ltd | GeologicalMapping,Electrical resistivity topography andSeismicrefraction,Borehole Drilling, Trial Pit Excavations + Laboratory Testing | May2022 - June2022 |
2022 | Geotechnical Investigations for NamaluandUnyamaLargeScale Irrigation Schemes | MinistryofWaterand Environment- Water for Production North | GeologicalMapping,Electrical resistivity topography andSeismicrefraction,Borehole Drilling, Trial Pit Excavations + LaboratoryTesting | June2022 - October2022,Electrical resistivity topography andSeismicrefraction,Borehole Drilling, Trial Pit Excavations + LaboratoryTesting |
2022 | GeotechnicalInvestigationsReport for Foundation Design of Water StructuresinKaruma. | SOGEASATOM Uganda | BoreholeDrillingTesting+Laboratory Testing | November2022 - December2022 |
2021 - 2011 | UpgradingofJinjaMbulamuti- Kamuli-Bukungu Geotechnical | SOGEASATOM Uganda | Dynamic Cone Penetration,DCP, Testing and Reporting | February 2021 |
2021 - 2011 | Geotechnical Investigations for TN 205 Burundi L1 220 kV DC (6.7km) andSC(65.6km)OHTLfromKabeziSS to Horezo SS Tower Schedule Check Surveys | KEC International | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | January 2021 to January 2023 |
2021 - 2011 | Geotechnical Investigations for DesignofAgagoSubstationand Agago Hpp | LARSEN&TOUBRO LIMITED (POWER TRANSMISSION AND DISTRIBUTION) | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | September2021 to October2021 |
Geological, Hydrological, Topographical and Geophysical Surveys
Year | Project Name | Client | Activities | Contract Period |
---|---|---|---|---|
2022 | GeotechnicalInvestigationsfor 132/33 kV OHTL Gulu Agago Transmission Line | KEC International | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | Jan2022 - Dec 2022 |
2022 | Geotechnical Investigations for AyillaandAcwaIrrigation Schemes | WAPCOS(U)Ltd | GeologicalMapping,Electrical resistivity topography andSeismicrefraction,Borehole Drilling, Trial Pit Excavations + Laboratory Testing | May2022 - June2022 |
2021 - 2011 | Geological survey(PSlogging) for Detailed design on Kampala flyover construction and road upgrading project | Shimizu Corporation,and KanoikeConstructionCo. Ltd, JV | Geological survey(PSlogging) and GPR survey | May2021 to June2021 |
2021 - 2011 | Geophysical Investigationsfor Quarry site for Apac-Lira- Puranga Road Construction Project | GÜLSAN A.S. INSAAT SANAYI TURIZM NAKLIYAT VE TICARET ANONIMSIRKETI | Electrical resistivitytomography and Seismic refraction | February2021 to March2021 |
2021 - 2021 | Geotechnical Investigations for TN 205 Burundi L1 220 kV DC (6.7km) andSC(65.6km)OHTLfromKabeziSS to Horezo SS Tower Schedule Check Surveys | KEC International | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | January 2021 to January 2023 |
2021 - 2021 | Geotechnical Investigations for DesignofAgagoSubstationand Agago Hpp | LARSEN&TOUBRO LIMITED (POWER TRANSMISSION AND DISTRIBUTION) | Vertical Electrical Sounding Testing,BoreholeDrilling,TrialPit Excavations, DPL Testing+ Laboratory Testing | September2021 to October2021 |
Project Design, Planning and Management
Year | Project Name | Client | Activities | Contract Period |
---|---|---|---|---|
2023 | Labor supply for construction works for Tilenga project Schlumberger Drilling Support Base in Buliisa District near Lake Albert | CADG-NYIKA CAPITAL JV | Skilled labor supply (masons, plumbers, electricians, steel fixers, carpenters, painters, mechanics, operators etc.) | May 2022 to July 2023 |
2023 | Service agreement for labor provision at Bujagali Energy Limited | BUJAGALI ENERGY LIMITED BEL | Labor provision for maintenance works | Ongoing |